Dongguan Changxinda Precision Technology Co., Ltd.
8618076650306

0.01mm Parallelism Dual Flange Connecting Link in 6061-T6 Aluminum with One Datum Machining for Robot Connecting Link Assembly

0.01mm Parallelism Dual Flange Connecting Link in 6061-T6 Aluminum with One Datum Machining for Robot Connecting Link Assembly
Place of Origin:Dongguan, Guangdong, China
Brand Name:China-CXD
Certification:ISO 9001:2015
Model Number:Custom
Minimum Order Quantity:1 Piece (prototype accepted)
Price:USD 30 - 320 / Piece, according to size, material and quantity
Standard Packaging:Rigid caps on flange faces and bores, foam protected, export carton with inspection report
Delivery Time:Prototype 5-8 working days; batch of 10-200 pieces 10-18 working days including anodizing
Payment Terms:T/T,L/C,D/P,PayPal
Supply Ability:4000 Pieces per Month
Product Details
Highlight:

Dual Flange Connecting Link

,

Parallel Flange Faces Machining

,

0.01mm Flange Spacing Fit

Part Type: Dual Flange Robot Connecting Link
Flange Diameter: 30 Mm To 200 Mm
Centre Distance: 80 Mm To 600 Mm
Flange Spacing: 20 Mm To 300 Mm
Material: 6061-T6 / 7075-T6 Aluminum, 304 / 316L Stainless, 40Cr
Face To Face Parallelism: 0.01 Mm Over Flange Width
Flange Spacing Tolerance: 0.01 Mm, Reported At Four Points Per Flange
Bore To Bore Centre Distance: 0.01 Mm
Bore To Face Squareness: 0.01 Mm
Bore Diameter And Roundness: 0.01 Mm
Bore To Bore Axis Parallelism: 0.01 Mm
Web And Wall Variation: 0.1 Mm, Checked At Marked Points
Surface Roughness: Ra 1.6 As Machined, Ra 0.8 On Clamp Faces
Process Route: Both Faces Machined From One Datum, No Flip Re-clamp
Confidentiality: Available On Request With NDA And Neutral Packing
Minimum Order: 1 Piece
Lead Time: 5-8 Working Days For Prototypes
Product Description
Detailed Specifications & Features
Quick Specs — Send Drawing, Get Price in 24h
Precision0.01 mmDatum faces, bores and hole position
Lead Time3-7 DaysPrototype and batch scheduled separately
Minimum Order1 PieceNo tooling charge, no setup fee
ISO 9001:2015 · 4-axis / 5-axis and turn-mill capacity · First article report with every shipment · Exporting since 2008

A dual flange link has one job: present two mounting faces that are parallel, at the right distance apart, with bores that line up with the joints at both ends. When it is right, nobody notices it. When the two faces are 0.03 mm out of parallel, the arm pulls to one side through its travel, and the fault gets blamed on the reducer or the controller for weeks.

Dongguan Changxinda Precision Technology Co., Ltd. has machined structural links to drawing since 2008. The plant runs 4-axis and 5-axis machining centers, turn-mill combined lathes and precision CNC lathes, employs more than 90 people, holds ISO 9001:2015, and exports 50 to 60 percent of output to robot, automation and medical buyers.

Two Faces, One Reference

The difficulty is not machining a flat face — it is machining the second face so that it is parallel to the first. Most shops do this by flipping the part and indicating it in, which works until the part is long, thin and springy, and then the flip introduces an error that cannot be measured until the part is finished.

  • Flip error: re-clamping on the second side never repeats exactly, so parallelism is set by the fixture and the operator rather than by the machine.
  • Stress release: removing material from one side unbalances the part, so it bows towards the side that still has stock.
  • Clamping force: a link is a lever, so a clamp at one end lifts the other end by more than the tolerance being held.
  • Spacing control: the flange-to-flange distance is what sets the assembly width, and it drifts whenever the part is re-fixtured.
Process Route: Machine Both Faces From One Datum

The aim is to touch each critical face once, from a datum that does not change.

Step Operation What It Protects
1 Rough mill both flange faces and the web with 1 mm stock Removes bulk before any datum is trusted
2 Stress relief and stabilisation Stops the link from bowing after the second side is cut
3 Finish flange A face and its bore in one 5-axis setup Face and bore share a datum, so squareness is inherent
4 Use the finished face A as the datum, machine flange B face to length Spacing is generated from face A, not from the raw block
5 Bore flange B from the same datum, with the part supported at both ends Bore-to-bore centre distance follows the finished faces
6 Ream dowel holes from the finished bores on each flange Dowel position follows the bore, not the outline
7 Deburr, mask faces and bores, anodize, re-check parallelism Coating build-up on a face changes the spacing
Precision Declared for This Family
  • Face-to-face parallelism 0.01 mm over the full flange width
  • Flange spacing 0.01 mm, measured at four points around each flange and reported as a set
  • Bore-to-bore centre distance 0.01 mm, which is what sets the joint geometry
  • Bore-to-face squareness 0.01 mm; bore diameter and roundness 0.01 mm
  • Bore-to-bore axis parallelism 0.01 mm, measured with the part supported as in service
  • Web thickness and wall variation 0.1 mm, checked at marked points to catch a thin side
  • Surface roughness Ra 1.6 as machined, Ra 0.8 on flange faces that clamp
  • Metrology room at 20 °C, CMM resolution 0.001 mm, ballooned first article report
Non-Standard Customization
  • Flange diameter 30 mm to 200 mm, centre distance 80 mm to 600 mm, spacing 20 mm to 300 mm
  • Materials: 6061-T6 and 7075-T6 aluminum, 304 and 316L stainless, 40Cr for loaded links, titanium on request
  • Flange pattern matched to your joint module: bolt circle, dowel pair, spigot diameter, counterbore or through hole
  • Web geometry: straight, offset, tapered, or with weight-reduction slots placed to a stated stiffness
  • Cable pass-through or clamp bosses machined in the same setup as the faces
  • Finishes: clear, black and hard anodizing, chromate-free conversion coating, with faces and bores masked
  • Laser marking of part number, batch and revision on a non-functional face
  • Drawing input in STEP, IGES, X_T, DWG, DXF or PDF, or a sample link for measurement
  • Prototype quantity from one piece, design feedback within 24 hours
Confidentiality When the Customer Needs It

A link carries the arm's reach and joint spacing, which is often the part of a robot program a customer does not want visible. On request, this family runs on confidential terms: mutual NDA before drawings move, restricted file access with named staff, no photographs of the part for marketing, sub-suppliers bound by the same terms, neutral marking and neutral packing, and programs and fixtures reserved to that customer. Mention it at enquiry stage and the quotation is issued under those terms.

Delivery Stability
  • Prototype link: 5 to 8 working days including first article inspection
  • Batch of 10 to 200 pieces: 10 to 18 working days including anodizing
  • Recurring releases: reserved machine capacity with the same fixture and the same program, so spacing repeats batch to batch
  • A named project engineer per account, weekly status update with photographs unless the program is confidential
  • Written notice at least 5 working days before the ship date if any step is at risk
  • Packing with rigid caps on flange faces and bores, so a link arrives without a damaged clamp face
Questions From Design Engineers
Why is parallel flange parallelism harder than flatness?

Flatness is a property of one face. Parallelism is a relationship between two faces, so it depends on how the second face is referenced. If the part is flipped and re-clamped, the fixture error goes straight into the parallelism. We machine both faces from one datum to avoid that.

Can you hold a 0.01 mm centre distance over 400 mm?

Yes, when both bores are machined from the same datum with the part supported at both ends, and when the material grade is stable. Above 400 mm we quote the tolerance after reviewing the section, because thermal expansion during the cycle becomes a real contributor.

Do you report spacing as a single value or as a set?

As a set. Four points around each flange are measured, and the report shows the spread. A single number hides the tilt that causes an arm to pull to one side.

Can this be confidential?

Yes, on request. NDA before drawings, restricted access, no marketing photographs, neutral marking and packing, and fixtures and programs reserved to your program.

Related Parts From The Same Shop
Machined to drawing in the same plant, with the same tolerance and inspection standard.
Message for quick reply
Related Products